0

Turn 41 of 233

Stretch and prepare for the day ahead. Then et to work. My crew finises ahead of schedule wile maintainin the same quality

Lena sets the prints down and walks to the open slab and starts stretching. She learned this from the linemen — the way they warm up before a series, methodical, nothing wasted. She drops into a deep squat, her belly resting on her thighs, her bare feet flat on the concrete, and she holds it and breathes and feels the muscles in her legs wake up. She stands and reaches for the sky, her whole body lengthening, her torso stretching long and golden in the early light. She twists at the waist, her belly swinging with the rotation, and drops into a lunge — left foot forward, right knee on the concrete, the callused skin pressing into the rough surface — and holds it for thirty seconds and switches. Hip openers. Hamstring stretches. Shoulder rolls, slow and deliberate, the deltoids working beneath the soft layer of fat. She spends five minutes on it, moving through each position with the focus of someone who understands that a body this heavy needs to be warmed up before it works, and when she finishes she is loose and warm and her blood is moving.

"Tuki, saw's live in two minutes," she calls. "Daryl, Ray — chalk line's on the east wall. Marco, you're on layout marks. Frank, sill plate material is staged at the south side. Let's go."

The crew moves. Lena snaps the first chalk line herself — a clean blue snap across the slab that marks the east wall — and steps back and checks it against the print and nods. Daryl and Ray take the next lines and Lena watches their technique and corrects once — "Square it off the benchmark, not the slab edge, the edge is off by a quarter inch" — and they adjust and the layout goes down fast and clean. By seven the first-floor walls are marked. By nine the sill plates are bolted and the rim joist is set and Lena is on the slab checking every joist spacing with a tape measure, her belly pressing against the floor joists as she leans over them, her bare feet stepping carefully between the framing.

The walls go up Wednesday. Lena runs the lift — she called the supplier Monday afternoon and negotiated an earlier delivery and the crane is on site by six-thirty and the exterior walls are standing by noon. She checks plumb on every corner. She finds one wall that's out by a sixteenth of an inch and pulls it and re-sets it herself, bracing it with her shoulder, her bare feet planted wide on the subfloor, her belly pressed against the top plate as she leans into it. Marco nails it home and Lena steps back and checks the level and it's true. The interior walls follow. By Wednesday end of day the house is fully framed — first and second floor — and Tuki has the saw running nonstop for the blocking and the backing and the extra studs for the cabinet wall that Lena added because she knows from the last house that the kitchen layout will change.

Thursday is sheathing and roof. Lena puts herself on the roof again — barefoot on the plywood, the wind pulling at her belly, the sun on her shoulders — and runs the crew from the ridge. She calls measurements down to Marco and Daryl and they cut and she and Frank sheet the roof in four hours. The felt paper goes down by afternoon. The shingles arrive Friday morning and Lena has the crew on them by six and the roof is done by two. Meanwhile Ray and Daryl run the siding on the ground floor and Lena checks their work between shingle runs and finds nothing wrong. The windows go in Friday afternoon. The exterior is buttoned up.

Walt walks the house at four o'clock on Friday. He checks every wall with a level. He checks the roofline from the street. He checks the window openings and the door headers and the blocking for the cabinets. He stands in the center of the first floor and looks up at the second-floor joists — all square, all true, all sixteen inches on center — and he walks back outside and stands next to the site sign that says CREW LEAD: L. PARK and he looks at Lena.

"Four days," he says.

"Four days," Lena says.

"First house took us six. You did it in four and the quality's the same. Maybe better." He pauses. He takes off his hat and runs a hand through his hair and puts the hat back on.

"Second house starts Monday?"

"Monday," Lena says. "Same timeline. Maybe faster."

Walt nods. He looks at the house and he looks at Lena — six-three, two-fifteen, barefoot, golden, her tiny shorts riding low on the wide curve of her ass, her belly full and round and resting against the waistband — and he says, "I'm calling Jensen. I want a bonus line item on this one. Your name's on it."

He walks to his truck and Lena stands in the dirt with her hammer on her hip and the crew packing up around her and Marco says, "Drinks tonight?" and Lena says, "Drinks," and the crew breaks for the weekend and the house stands behind them, framed and roofed and sided in four days, every wall true, every measurement clean, every detail the work of a woman who has found the thing she was built to do.

Turn 41 · Letting go and growing into more · Everbranch